Tile is the last thing to happen and the first thing anyone looks at, which is why so much attention goes to it and so little to the substrate underneath. Every bathroom failure we are called to repair is the same failure: water found a path through a transition — a corner, a curb, a niche return, a drain flange, a shower door track — and moved into framing that nobody could see.
So we draw the waterproofing. Membrane type and coverage, pre-sloped substrate, movement joints, how the niche is formed and where its slope falls, how the linear drain meets the membrane. Then it is flood-tested and inspected before a single decorative material arrives. That sequence is not negotiable and it is not fast, and it is the difference between a bathroom at twenty years and a bathroom at seven.
Everything above the membrane is where the room becomes personal: the slab that wraps the tub deck, the vanity drawn around your plumbing rather than bought to fit, the mirror that is actually a cabinet, light that does not make anyone look ill at six in the morning.

A bathroom contract usually covers all of the below, and in a primary suite it often extends into the closet and the bedroom wall behind it.
Measured survey, controlled strip-out, and the framing changes a curbless entry or a relocated fixture requires — sistered joists, dropped bays, new headers.
Membrane specified and drawn for the assembly, corners and transitions detailed, pre-sloped substrate, flood-tested and inspected before tile.
Supply, waste and vent set to the fixture schedule, valve heights confirmed on site with you, and linear or point drains positioned to the tile layout rather than the other way round.
Slab selection and marking, book-matched walls and tub surrounds where the stone allows, layout set out on drawings so the cuts land where they should.
Vanities, mirror cabinets, linen storage and closet joinery built to the room, with plumbing coordinated to the drawer boxes so nothing has to be cut out later.
Sealed enclosures with sloped ceilings, generator siting and service access, dedicated circuits, and electric floor mats zoned on their own thermostat.
Extraction sized for the room and ducted to outside air, humidity-sensing controls, and make-up air for a steam enclosure so the moisture leaves rather than settling in the ceiling.
Layered light at the mirror, in the shower and low for the night, plus blocking for grab bars, a bench and a 36-inch door, detailed so none of it reads as equipment.

Shorter than a kitchen and less forgiving, because the two stages that matter most happen behind the finished surface.
We look at the room, the floor structure below it and where the drains currently run, then give a costed range.
Layout, fixture schedule, tile setting-out and vanity drawings, priced as they develop.
Stone marked, fixtures and glass ordered against real lead times, permits filed, waterproofing assembly specified.
Strip-out, framing, rough-in, waterproofing and flood test, tile, vanities, glass, fixtures, light.
Valves and steam commissioned, glass adjusted, snags closed, and a return at eleven months when grout and glass have had a year of use.

Select an image to enlarge. Arrow keys move between images, Escape closes.

Any builder will tell you they waterproof. These are the specifics worth asking about, and the answers you should expect.
Sheet membrane is consistent in thickness and can be tested immediately; liquid is easier around complex shapes but only as good as the applied film. We use sheet on flat runs and liquid at penetrations, bonded to each other.
Slope belongs in the substrate, not in the mortar bed under the tile. A floor sloped only at the surface holds water inside the assembly permanently.
Most niches are cut into the waterproofing after it is installed. Ours are formed first, sloped to drain, and the membrane is returned into them before tile.
Drain plugged, floor filled, left overnight, checked from the ceiling below. It costs a day. Skipping it is how a leak is discovered from a stain in the dining room two years later.
Tile expands, framing moves, and Dallas humidity swings hard between seasons. Perimeter and field joints in flexible sealant keep the field from cracking where it meets a wall.
Cementitious grout is easier to work and easier to stain; epoxy resists both and is unforgiving to install. Frameless glass needs its own tolerance allowance — panels are templated after tile, never before.


The same coordination applied to the other room where cabinetry, stone and services all land in the same square meter.
Kitchens →→Finishes, fittings and the closet behind the suite specified alongside the build rather than chosen at the end.
Interior Design →→If the suite is part of a larger renovation or a new house, it costs less to hold it all under one contract.
Custom Homebuilding →→
A few photographs and the floor below it will tell us most of what we need. We reply within two business days. Based in Dallas/Fort Worth and available for projects outside the Metroplex.
214-901-3655