Interior Design
Finishes, millwork and furnishing developed alongside the build, so the house is finished rather than merely complete.
Interior Design →→Approach
By the time a slab is poured, almost every decision that determines what the house costs and how long it takes has already been made: which lot, how the foundation is engineered for the soil under it, how much glass faces west, how the roof turns a corner, and whether the millwork is drawn or bought. Our job in the first six months is to make those decisions with you while they are still cheap to change.
We work design-build. That means we price the drawings as your architect develops them — ours or yours — so the budget is a live number you can steer rather than a verdict delivered at bid. When a detail cannot be built for what it was estimated at, you hear it in the design meeting, with two alternatives and what each costs.
On site, the practice is small on purpose. A superintendent is on your house every working day, you get a written update every week with photographs, and once a month we meet on the job with the schedule and the numbers in front of us. A house is two years of small decisions, and almost all of them are easier to get right standing in the room.

A ground-up commission covers all of the below. If you already have an architect and a permitted set, we join at pre-construction and price what exists.
Before you buy: soil and foundation implications, drainage and floodplain, trees and setbacks, easements, utility availability, and what the street will support in value.
We work with architects we know well, or with yours. Either way we cost the drawings as they develop and flag what will not build as shown while it is still a drawing.
A costed range after the first site visit, refined through design, and fixed as a contract sum at the end of pre-construction. Every allowance is written down with what it assumes.
Engineering, survey, geotechnical work, selections, the trade schedule and the permit set. This stage is why the build stays on program.
A dated selections calendar showing what has to be decided by when, and what happens to the schedule if it is not. Stone, tile, plumbing, appliances and lighting have the longest leads.
Filing, plan review, tree and demolition permits where required, and every inspection through to certificate of occupancy. Highland Park and University Park run their own processes and their own timelines.
A superintendent on site daily, trades scheduled rather than summoned, a written weekly update with photographs, and a monthly meeting on the job.
Commissioning of every system, a walk-through with manuals and warranties, the snag list closed before you move in, and a return visit at eleven months.

Two and a half years, in five stages. The one people underestimate is pre-construction, and it is the one that decides whether the other four hold.
We walk the lot with you, talk through the house you have in mind and what it is likely to cost, and tell you if the site will fight you.
Schematic through construction documents with your architect, priced at each stage so the design and the budget move together.
Geotechnical and structural engineering, survey, selections, permit set, trade buy-out. Contract sum and calendar fixed.
Site work, foundation, frame, dry-in, rough-in, finishes, landscape. Daily supervision, weekly written updates, monthly meetings on site.
Systems commissioned and demonstrated, documents handed over, snags closed, then a return at eleven months to correct what the first year has shown.

Select an image to enlarge. Arrow keys move between images, Escape closes.

Most of the expensive surprises in a custom house are decided by the site, not the specification. These are the ones we check before anybody signs a purchase contract.
Much of Dallas sits on clay that swells and shrinks with moisture. Foundation design follows a geotechnical report, not a template, and post-tension slab detailing plus a watering plan are part of the house, not an upgrade.
Water has to leave the site somewhere, and on an infill lot that somewhere is usually a neighbour. Grading, area drains and retention are cheaper to design than to retrofit after the first heavy spring.
Mature canopy is most of what makes a Preston Hollow lot valuable, and the municipalities protect it. Tree surveys, mitigation and root-zone protection affect footprint, staging and program.
Highland Park and University Park hold tight envelopes. The house you can build is often smaller than the house the lot appears to allow, which is a design constraint worth knowing before purchase.
A wall of glass facing a Texas afternoon is a mechanical load and a fading problem. Orientation, overhang depth, glazing coating and shading are resolved together or paid for monthly.
Service capacity, sewer depth, gas availability and recorded easements decide where the house and the pool can physically go. We pull the plat before the design starts.


Finishes, millwork and furnishing developed alongside the build, so the house is finished rather than merely complete.
Interior Design →→Loggias, pools and summer kitchens designed with the house, which is the only time the grading and the slab can be got right.
Outdoor Living →→Theaters, acoustics and whole-house systems planned during framing, when the walls are still open.
Media & Entertainment →→
An hour on the site will tell you more about what the house will cost than a month of drawings. Send the address and when you are free. Based in Dallas/Fort Worth and available for projects outside the Metroplex.
214-901-3655