Cabinetry, stone, ventilation and services drawn together and built by one team, in houses that are usually still being lived in.

Approach

A kitchen is a services problem wearing joinery.

Most of what makes a kitchen work well is decided before anything visible is installed: where the gas and water run, how much air the hood actually moves and where that air goes, whether the slab can take the island's plumbing, and how far the run of cabinetry can go before it needs a joint. We resolve those together, in one set of drawings, with the trades who will build them in the room.

That order of work is also what protects the finishes. Stone is templated from the cabinetry as set, not from the plan, so the reveal at the wall is consistent. Appliances are specified before cabinetry is released, so the cut-outs are right the first time. Ventilation is sized for the range you actually bought.

We build our own designs and other people's. If you are working with a kitchen designer or an architect, we price their drawings as drawn and tell you plainly where a detail will not build — during pricing, not during installation.

Scope

What is included

A kitchen contract usually covers all of the below. Where you have already appointed a designer, we take the drawings and run the rest.

  1. Survey and demolition

    Measured survey of the existing room, asbestos and structure checks where the house warrants it, protection of the route in, and controlled strip-out.

  2. Structure and openings

    Beams, header work and opening changes where the plan calls for them, with engineering and permits handled before the wall comes out.

  3. Mechanical, electrical and plumbing

    Gas, water, waste and circuits coordinated to the appliance schedule rather than to a generic layout.

  4. Lighting layers

    Ambient, task and accent circuits on separate controls: undercabinet light on the work surface, something low over the island for the evening, and nothing glaring off polished stone.

  5. Ventilation

    Hood sizing, duct routing and make-up air, calculated for the range and the house rather than assumed from the cabinetry drawing.

  6. Cabinetry and millwork

    Custom cabinetry where the run, the ceiling height or the appliance panelling demands it; semi-custom where a standard box will do the same job for less. We will tell you which parts of your kitchen genuinely need the former.

  7. Island, seating and scullery

    Island size set by the aisle it leaves rather than the drawing, seating counted for the people who actually sit there, and a butler's pantry or scullery where the main room should stay clear.

  8. Stone and surfaces

    Slab viewing and marking with you, templating after cabinetry is set, seam and vein layout agreed before cutting.

  9. Tile, floor and finish

    Backsplash, floor, paint and the transitions to adjoining rooms, sequenced so nothing finished gets worked over twice.

  10. Appliances and commissioning

    Delivery, installation, connection and a walk-through of every unit with the manuals and warranties handed over.

Kitchen at range wall, hood and stone in frame
Process

How a kitchen runs

The firm-wide sequence, in kitchen terms. The two stages that decide whether the schedule holds are pre-construction and the appliance schedule.

  1. 01

    Consultation

    We walk the room, talk through how you cook and who is in there at once, and give a costed range before drawings are commissioned.

  2. 02

    Design

    Layout, elevations and cabinetry drawings developed with you or your designer, priced as they change.

  3. 03

    Pre-construction

    Appliances specified, cabinetry released, stone slabs marked, permits filed, trades booked. The contract sum is fixed here.

  4. 04

    Build

    Strip-out, structure, services, cabinetry, stone, tile and finish, in that order, with a temporary kitchen running throughout.

  5. 05

    Handover

    Appliance commissioning, a full walk-through, snag list closed, then a return visit at eleven months.

Selected details

Select an image to enlarge. Arrow keys move between images, Escape closes.

Materials

What the choices actually cost you later.

Selections are usually made on appearance. These are the properties that decide how the room behaves in five years, and they are worth knowing before you stand in a slab yard.

  1. Marble

    Etches with lemon and wine and will patina in a working kitchen. Honed hides it better than polished. Choose it because you like how it ages, not because you expect it not to.

  2. Quartzite

    Harder than marble and far more stain-resistant, with much of the same movement. Slabs vary in porosity, so sealing advice depends on the specific stone.

  3. Engineered stone

    Consistent, non-porous and predictable across a long run. It will not tolerate a hot pan directly, and the seams read straighter than natural stone.

  4. Cabinetry construction

    Plywood boxes, dovetailed drawers and full-extension hardware are what make cabinetry feel solid in year ten. Door style is the part you see; box construction is the part you notice.

  5. Paint versus stain

    Painted cabinetry shows movement at the joints in a house with seasonal humidity swings. Stained and rift-sawn timber conceals it. Dallas summers argue for the second in large kitchens.

  6. Ventilation

    A commercial-style range needs real extraction and make-up air, otherwise the house pulls air back down the flue. This is a calculation, not a preference.

Questions

Plan on ten to sixteen weeks on site for a full kitchen, longer where structure moves or where stone and cabinetry have long lead times. We set a temporary kitchen elsewhere in the house before demolition begins.

Yes. We build to other designers' and architects' drawings regularly, and we price them as drawn. Where a detail will not build as shown, we say so during pricing rather than during installation.

Before cabinetry is released for manufacture. Appliance specifications set cut-outs, clearances, ventilation and electrical loads, so a late change is a cabinetry change and a services change at the same time.

We arrange the slab viewing and mark the slabs with you, then template after cabinetry is set rather than from drawings. Seams and vein direction are agreed before cutting.

We give a costed range after the first site visit, before any drawings are commissioned.

Often, and the logistics are agreed before demolition rather than improvised. We build a temporary kitchen — usually sink, refrigerator, microwave and a run of worktop in a nearby room — seal the work area with zippered barriers and run negative-pressure extraction, cover the route in, and set access hours the trades keep to. Expect noise, and expect two or three days of it to be genuinely disruptive.

Related work

Interior — furnished living room

Interior Design

Finishes and furnishing decided alongside the build, so the kitchen belongs to the house rather than sitting apart from it.

Interior Design
Interior — primary bath, stone detail

Bathrooms

The same discipline applied to a wetter room: waterproofing and slab layout resolved before tile is set.

Bathrooms
Exterior — new construction, front elevation

Custom Homebuilding

If the kitchen is one room in a larger project, it is easier and cheaper to hold it all under one contract.

Custom Homebuilding

Tell us how you cook.

Send the room, the appliances you have in mind and when you would like to be back in it. We reply within two business days. Based in Dallas/Fort Worth and available for projects outside the Metroplex.

214-901-3655
City and state. We are not limited to DFW.