Six disciplines, one contract.

Design and construction under one agreement.

We work design-build, which means the drawings are priced as they are drawn and the budget is a live number rather than a surprise at bid. Any one of the six scopes below can be the whole project, and several of them usually arrive together — a kitchen that turns into a first floor, a pool that turns into a loggia. Holding them under a single contract removes the argument that costs clients the most time: whose responsibility a problem is.

01

Custom Homebuilding

Ground-up residences from the site survey to the final walk-through. We build to your architect's drawings or bring one in, price the design as it develops, and hold the schedule with a superintendent on site every working day. Most new houses run eighteen to twenty-four months from first drawing to keys.

Custom Homebuilding
Exterior — new construction, front elevation at dusk
02

Kitchens

Cabinetry, stone, ventilation and services drawn together rather than sourced separately. Appliances are specified before cabinetry is released and stone is templated from the cabinetry as set, which is why the reveals line up. Ten to sixteen weeks on site, with a temporary kitchen running throughout.

Kitchens
Interior — kitchen island and range wall, morning light
03

Bathrooms

Primary suites and guest baths, with waterproofing, slab penetrations and tile layout resolved on paper before a single tile is set. Wet rooms and steam showers are detailed for the long term, because a failure behind tile is not a snag, it is a rebuild.

Bathrooms
Interior — primary bath, stone and glass detail
04

Outdoor Living

Loggias, pools, summer kitchens, fireplaces and the grading and drainage that keep them dry. We treat these as rooms with a roof budget and a slab, not as landscaping, which is what makes them usable in August and in January.

Outdoor Living
Exterior — loggia and pool at dusk
05

Interior Design

Finishes, millwork, lighting and furnishing decided alongside construction rather than after it. Working this way means the joinery is drawn for the furniture that is actually going in, and nothing has to be undone to make a piece fit.

Interior Design
Interior — furnished living room, natural light
06

Media & Entertainment

Theaters, listening rooms, gyms and whole-house systems, with wiring, acoustic isolation and sightlines planned during framing. Retrofitting any of it later costs several times what it costs to do while the walls are open.

Media & Entertainment
Interior — media room, seating and screen wall
Process

The same five stages, whatever the scope.

A bathroom runs the sequence in three months and a house runs it in two years, but the order does not change, and neither does what you are told at each stage.

  1. 01

    Consultation

    One to two weeks

    We walk the site or the house, talk through scope and budget, and give a costed range before drawings begin.

  2. 02

    Design

    Three to six months

    Plans and elevations developed with your architect or ours, priced as they change.

  3. 03

    Pre-construction

    Six to ten weeks

    Selections, permits, engineering and the trade schedule. Contract sum and calendar are fixed here.

  4. 04

    Build

    Three to eighteen months

    A superintendent on site daily, a written update weekly, and a monthly meeting on the job.

  5. 05

    Handover

    Two weeks, then one year

    Commissioning, systems walk-through, manuals and warranties, and a return visit at eleven months.

Not sure which scope your project is?

Describe it in a sentence or two and we will tell you what it involves and roughly what it costs. We reply within two business days.